EPA-Certified · OSHA Compliant · Licensed Abatement Contractor

Licensed. Contained. Gone.

From the first fiber sample to the final clearance certificate — we handle everything. Residential, commercial, and school abatement with zero delays to your project timeline.

Call Now — Emergency Response
2,400+
Projects Completed
< 48hr
Survey Response
100%
Clearance Rate
The Abatement Process

From First Call to
Final Certificate.

Every step is designed to answer the question you're already asking. Scroll through to see exactly what happens — and when your building comes back.

Inspection & Sampling

We find it before it finds you.

Licensed surveyors walk every square foot of the affected area, mark suspected ACM locations on architectural floor plans, and pull bulk samples for accredited laboratory analysis.

"Will they miss something?"
NVLAP-accredited lab results in 24–48 hours. Every sample logged, photographed, and GPS-tagged on your survey report.
  • Full building walkthrough with P100 half-face respirators
  • Bulk sampling per AHERA protocol
  • NVLAP-accredited laboratory analysis
  • Written survey report with ACM inventory
Project Progress
1–2 Days
Start20%
Surveyor in PPE marking asbestos-containing material locations on architectural floor plans inside a building
Step 01
Containment Setup

Nothing leaves the zone.

Before a single tile is touched, our crew erects 6-mil polyethylene barriers, installs HEPA-filtered negative air machines, and builds a three-stage decontamination airlock at every entry point.

"Will fibers spread through my building?"
Negative air pressure verified by digital manometer before work begins. Your occupied spaces stay at 0.02 f/cc or below throughout.
  • 6-mil poly barriers, floor to ceiling
  • HEPA negative air machines — 4 air changes/hour minimum
  • Three-stage decontamination airlock
  • Digital manometer verification before work begins
Project Progress
4–8 Hours
Start40%
Workers installing thick polyethylene containment sheeting floor to ceiling with negative air machine visible in background
Step 02
Removal in Progress

Wet. Strip. Double-bag. Repeat.

Amended water is applied to keep fiber counts at the source. Material is wet-stripped, immediately double-bagged in 6-mil poly, labeled per EPA 40 CFR Part 61, and staged in the decontamination unit — never in occupied corridors.

"Will this damage my building or delay my renovation?"
Our crews work to your general contractor's schedule. Pre-demolition abatement is typically complete before GC mobilization.
  • Amended water application — OSHA 1926.1101
  • Wet-strip method for friable ACM
  • EPA 40 CFR Part 61 labeling on every bag
  • No ACM staged outside the decontamination unit
Project Progress
1–5 Days
Start60%
Technician in white Tyvek suit and full-face P100 respirator wet-stripping pipe insulation with HEPA vacuum nearby
Step 03
Air Monitoring & Clearance

The number that opens your building.

After removal, an independent industrial hygienist — not our crew — performs aggressive air sampling. Phase Contrast Microscopy results must read below 0.01 f/cc before we issue the clearance certificate.

"Is my building actually safe to reoccupy?"
Independent third-party clearance. If the number isn't below 0.01 f/cc, we re-clean at no charge until it is.
  • Independent third-party industrial hygienist
  • Phase Contrast Microscopy (PCM) analysis
  • Clearance threshold: 0.01 f/cc
  • Written clearance certificate issued upon passing
Project Progress
4–24 Hours
Start80%
Industrial hygienist collecting air samples with cassette sampler in cleared containment zone, clipboard with test results visible
Step 04
Waste Transport & Documentation

Manifested. Disposed. Documented.

All ACM waste is transported in sealed, labeled containers by a licensed hazardous materials hauler to an EPA-approved Class II disposal facility. You receive a complete project file: manifests, disposal receipts, air results, and clearance certificate.

"What if I get audited by a regulator?"
Your project file is a complete regulatory defense. Disposal manifests, chain-of-custody records, and clearance certs — organized and delivered within 5 business days of project close.
  • Licensed hazmat hauler — DOT compliant
  • EPA-approved Class II disposal facility
  • Uniform Hazardous Waste Manifest (UHWM)
  • Complete project file delivered within 5 business days
Project Progress
1–2 Days
Start100%
Stack of completed EPA waste manifests and clearance certificates on a clipboard with ABATE project folder
Step 05
The Evidence

Data doesn't lie.
Neither do we.

Every project generates a chain of evidence. Here's what ours looks like.

Full containment zone with polyethylene sheeting floor to ceiling, negative air machines running, technician in Tyvek suit at work
Active Containment

6-mil poly, floor to ceiling.
Nothing leaves this zone.

PCM Air Sample
PASS
0.003
fibers / cubic centimeter
0.000Clearance threshold: 0.010.02

Independent PCM analysis — NIOSH 7400 method.
Sample ID: ABT-2026-0847 · Lab: EnviroTest Associates

Credentials
EPA AHERA
Certified Inspector & Supervisor
OSHA 1926.1101
Construction Standard Certified
DOT Hazmat
Licensed Hauler — 49 CFR
State Licensed
All 50 States + DC

"We had pre-demolition results on a Friday. Abate had a crew on-site Tuesday morning. The GC never lost a day."

Marcus Webb
VP Development, Meridian Commercial Group · Denver, CO
EPA waste manifests and disposal receipts organized in a project documentation folder on a desk
Documentation

Complete project file.
Delivered within 5 business days.

By The Numbers
2,400+
Projects
35+
States
100%
Clearance
Sandra Okafor, building manager headshot, professional woman in business attire

"The school district required clearance documentation for the board meeting. Abate had the full package — manifests, lab results, clearance cert — in my inbox before the meeting date."

Sandra Okafor
Facilities Director, Jefferson Unified School District · Columbus, OH
Credentials & Coverage

The licenses that let us
show up Tuesday.

0+
Projects Completed
Since 2004
0hr
Survey Response
Average nationwide
0%
Clearance Rate
First-pass air tests
0+
States Licensed
Including DC

Licenses & Certifications

EPA AHERA
Asbestos Hazard Emergency Response Act
OSHA Certified
Construction Standard 1926.1101
NVLAP Lab
Accredited Laboratory Partner
DOT Licensed
Hazardous Materials Transporter
NESHAP
National Emission Standards Certified
State Licensed
All 50 States + DC
< 48 hr
Emergency Response Available
24/7 dispatch for pre-demolition critical path

We Service

Residential
Single & multi-family
Commercial
Office, retail, industrial
Schools & Gov
AHERA compliant
Pre-Demolition
Full survey + removal
1-800-555-0199
Emergency abatement — available 24/7
Book Your Site Survey

The call you've been
putting off.
Make it today.

Fill out the form and a licensed project manager will contact you within 2 business hours to confirm your survey date and answer any questions. No obligation, no pressure — just a plan.

Response in 2 hours
During business hours. Emergency line for after-hours.
Survey in 48 hours
Most markets. Same-day available for critical path.
Written report in 72 hours
Lab results, ACM inventory, and removal scope.
Fixed-price proposal
No surprises. Scope changes documented in writing.

Already have lab results? Need someone today?

Call 1-800-555-0199
Emergency abatement dispatch — 24/7

By submitting, you agree to be contacted by an Abate project manager. No spam, ever.