Licensed. Contained. Gone.
From the first fiber sample to the final clearance certificate — we handle everything. Residential, commercial, and school abatement with zero delays to your project timeline.
From First Call to
Final Certificate.
Every step is designed to answer the question you're already asking. Scroll through to see exactly what happens — and when your building comes back.
We find it before it finds you.
Licensed surveyors walk every square foot of the affected area, mark suspected ACM locations on architectural floor plans, and pull bulk samples for accredited laboratory analysis.
- Full building walkthrough with P100 half-face respirators
- Bulk sampling per AHERA protocol
- NVLAP-accredited laboratory analysis
- Written survey report with ACM inventory

Nothing leaves the zone.
Before a single tile is touched, our crew erects 6-mil polyethylene barriers, installs HEPA-filtered negative air machines, and builds a three-stage decontamination airlock at every entry point.
- 6-mil poly barriers, floor to ceiling
- HEPA negative air machines — 4 air changes/hour minimum
- Three-stage decontamination airlock
- Digital manometer verification before work begins

Wet. Strip. Double-bag. Repeat.
Amended water is applied to keep fiber counts at the source. Material is wet-stripped, immediately double-bagged in 6-mil poly, labeled per EPA 40 CFR Part 61, and staged in the decontamination unit — never in occupied corridors.
- Amended water application — OSHA 1926.1101
- Wet-strip method for friable ACM
- EPA 40 CFR Part 61 labeling on every bag
- No ACM staged outside the decontamination unit

The number that opens your building.
After removal, an independent industrial hygienist — not our crew — performs aggressive air sampling. Phase Contrast Microscopy results must read below 0.01 f/cc before we issue the clearance certificate.
- Independent third-party industrial hygienist
- Phase Contrast Microscopy (PCM) analysis
- Clearance threshold: 0.01 f/cc
- Written clearance certificate issued upon passing

Manifested. Disposed. Documented.
All ACM waste is transported in sealed, labeled containers by a licensed hazardous materials hauler to an EPA-approved Class II disposal facility. You receive a complete project file: manifests, disposal receipts, air results, and clearance certificate.
- Licensed hazmat hauler — DOT compliant
- EPA-approved Class II disposal facility
- Uniform Hazardous Waste Manifest (UHWM)
- Complete project file delivered within 5 business days

Data doesn't lie.
Neither do we.
Every project generates a chain of evidence. Here's what ours looks like.

6-mil poly, floor to ceiling.
Nothing leaves this zone.
Independent PCM analysis — NIOSH 7400 method.
Sample ID: ABT-2026-0847 · Lab: EnviroTest Associates
"We had pre-demolition results on a Friday. Abate had a crew on-site Tuesday morning. The GC never lost a day."

Complete project file.
Delivered within 5 business days.

"The school district required clearance documentation for the board meeting. Abate had the full package — manifests, lab results, clearance cert — in my inbox before the meeting date."
The licenses that let us
show up Tuesday.
Licenses & Certifications
We Service
The call you've been
putting off.
Make it today.
Fill out the form and a licensed project manager will contact you within 2 business hours to confirm your survey date and answer any questions. No obligation, no pressure — just a plan.
Already have lab results? Need someone today?